Construction work in Branch Library 5 from 18.03.
From Monday, 18 March, painting and electrical work is planned in the copy room of Branch Library 5. Disruption to the library area is to be expected during the work. In particular, we are unable to offer a Campusprint device during this time. The equipment will be dismantled on Friday, 15 March and will not be available until the end of the renovation work. Please switch to other branch libraries if necessary.
You can find other locations of the Campusprint devices here: /medientechnik/kopieren-und-drucken/